下载列表:0

刊物


Screenshot 2024-01-26 151706
TechConnect Fund Project “Develop the Technology to Produce Plans for Statutory Submission from the Building Information Modelling (BIM)” (只提供英文版本)
Independent Checking Unit (ICU) applied the TechConnect Fund Project "Develop the Technology to Produce Plans for Statutory Submission from the Building Information Modelling (BIM)". The project was approved under the TechConnect Block Vote of the Innovation and Technology Bureau in October 2017. The key objective of this project is to minimise manual-editing works during production of 2D plans from BIM for statutory and building control submission, including General Building Plan, Superstructure Plan and Foundation Plan. ICU has uploaded the deliverables of the project to their website in the Transport and Housing Bureau on 30 September 2020 for used free of charge by relevant government departments, stakeholders in the construction industry of Hong Kong and the public. Please go to the below webpage for downloading the document. https://www.hb.gov.hk/icu/eng/bim/index.html

CIC Special Conditions of Contract for BIM_Cover 2021
CIC BIM Special Conditions of Contract (September 2021) (只提供英文版本)
The BIM CIC Special Conditions of Contract provides a set of contract clauses that address aspects of collaboration between various project parties contributing information to and extracting information from the Model to achieve the stipulated BIM Uses in the design and construction as identified in the Exchange Information Requirements for the Project. For more information, please refer to the 'Purpose' in the publication.