香港專上院校所提供之論文/研究刊物

關鍵字

以下資料由與建造業議會簽署合作備忘錄的專上學院提供。

院校

類型

Date: From

To

院校 題目 類型 日期 作者 摘要 網頁
HKUST Evaluation and Development of Automated Detailing Design Optimization Framework for RC Slabs Using BIM and Metaheuristics Thesis 08/2019 Muhammad AFZAL Reinforced concrete (RC) structural design optimization has been undertaken for several decades and plays an important role in maximizing the reliability, cost efficiency, and environmental sustainability of RC structures. However, optimization of RC structural design is challenging and requires advanced strategies during different life cycle phases of RC structures. Over the past few decades, substantial fundamental research efforts in RC structural design optimization have been undertaken, but there is a lack of a comprehensive review of these efforts that can provide academic and industry practitioners with sufficient detailed insights. Therefore, this research introduces a critical evaluation of previous research related to the optimization of RC structures for minimizing the amount of construction materials, the material cost, and the environmental effects, with more emphasis on detailing design (such as steel reinforcement), aiming to identify the common research themes and highlight the future directions. Based on the critical evaluation, the portfolio of 348 available research articles presents the identified research gaps and potential future research directions. For example, the adoption of clash-free rebar design optimization, detailing design optimization of complex and irregular RC components, and the concentration of design for manufacture and assembly (DfMA) aspects, are seldom conducted and studied.
Moreover, steel reinforcement detailing design of RC structures is one of the common and important tasks in building construction. Currently, despite having introduced advanced computing technologies in the architecture, engineering, and construction (AEC) industry, the rebar detailing design process is still predominantly performed by manual or at least semi-manual approaches, with the aid of computer software packages following the regional design codes. Manual or semi-manual perspectives often result in conservative, uncertain, and sometimes unacceptable outcomes. Additionally, the simple design of RC structural elements can potentially face constructability issues such as congestion, collision, and complexity which may cause complications during the procurement of rebars and other elements all along the construction phase. These issues also hinder concrete pouring and as a result, generate improper compounding of concrete with the rebars which disturb the integrity of the RC structure. All these concerns substantially increase the construction cost, time and quality and thus are uneconomical for AEC industry stakeholders. Although a few previous studies have conducted detailing design optimization of RC structures, very little attention has been given to the above-mentioned issues. Therefore, this research also aims to develop a holistic BIM-based framework utilizing the different meta-heuristic algorithms (such as SGA, SGA-SQP, and PSO-SQP, etc.) for the optimal detailing design of RC solid slabs, considering the minimization of overall construction cost. The main objective function determines the overall minimized construction cost of the RC solid slab, including the cost of steel reinforcement bars in all reinforcing layers, the cost of concrete, and the cost of labor for installing the steel reinforcement bars and pouring the concrete in the RC solid slab. The optimization process is handled in such a way that the first stage optimizes the steel reinforcement present in all four reinforcing layers (two layers each at the bottom and top of solid slab), while the second stage optimizes the solid slab thickness based on the characteristic concrete strength.

For the optimum design to be directly constructible without any further alterations, aspects such as available standard rebar diameters, spacing requirements of the rebars, relevant regional design provisions (i.e. British Standards), and the above-mentioned constructability (more specifically clash-avoidance) concerns, are also incorporated into the development of optimization model. In this research, a case study of a typical RC solid slab containing one-way and two-way spanning slab panels is analyzed to investigate the capabilities of the proposed framework. The results demonstrate the potential of the developed model in producing optimum and realistic design solutions. The developed model can be utilized as a design tool to retrieve economical design solutions at the early-stage structural detailing design.
N.A.
HKUST BIM-based Automatic Generation of Fabrication Drawings for Building Facades Thesis 08/2018 Min DENG Many modern commercial buildings involve complex shaped façades, resulting in increasing complexity as well as challenges in façade fabrication and assembly processes. Currently, fabrication drawings are essential for fabrication, design evaluation and inspection of building components. Computer-aided automation, which can significantly improve the efficiency and accuracy of the fabrication and assembly process, is thus essential for the generation of façade fabrication drawings, thereby supporting the fabrication and assembly of the building façade components. Among current computer-aided technologies, building information modeling (BIM) has been widely applied to many sophisticated building projects due to its comprehensive ability in digital representation of building models. BIM has demonstrated its advantages over generating different types of drawings. However, generating fabrication drawings for façade panels using conventional approaches is time-consuming and error prone, especially when the number of façade components become huge. Therefore, this thesis aims to develop BIM-based methodologies to automate the generation of fabrication drawings for façade components, thereby facilitating the whole construction process.

For façade panels, a BIM-based framework is proposed for the automatic generation of fabrication drawings for façade panels. The framework integrates both graphical and non-graphical information from BIM models and other external data sources. Specific algorithms are applied to automatically generate the graphical information on the drawing templates based on the BIM geometric models. Title blocks of the drawing templates are also automatically filled in with corresponding non-graphical information. Complete fabrication drawings as well as a tabulated file with essential graphical information on similar components are then generated automatically.

For structural components such as mullions and transoms, it is important to represent their physical characteristics clearly, thus a large number of section views need to be produced, which is a time-consuming process and very labor intensive. Therefore, automatic generation of fabrication drawings for building façade components (such as mullions and transoms) is of paramount importance. In this thesis, attempts have been made to develop an efficient framework in order to automatically generate fabrication drawings for building façade structural components, including mullions and transoms. To represent the complex physical characteristics (such as holes and notches) on mullions and transoms using minimum number of drawing views, a computational algorithm based on graph theory is developed to eliminate duplicated section views. Another methodology regarding the generation of breaks for front views is also proposed to further improve the quality of drawing layouts. The obtained drawing views are then automatically arranged using a developed approach. In addition, primary dimensions of the drawing views focusing on the physical features are also generated. Furthermore, in order to maintain the consistency of the drawing formats, a methodology is proposed to simulate the scales of the drawings by using clustering technique.

With the adoption of the proposed BIM-based methodologies, time and human effort in the generation of fabrication drawings for façade components can be significantly reduced, and all the fabrication drawings for similar components will follow a consistent drawing format with explicit layout, thereby enhancing their readability.
N.A.
HKUST Automated Optimization and Clash Resolution of Steel Reinforcement in RC Frames Using Building Information Modeling and Hybrid Genetic Algorithm Thesis 08/2017 Mohit MANGAL Reinforced concrete (RC) is widely used in building construction. Steel reinforcement design for RC frames is a necessary and important task for designing RC building structures. Currently, steel reinforcement design is performed manually or semi-automatically with the aid of computer software. These methods are error-prone, time-consuming, and sometimes resulting in over-design or under-design. In addition, clashes of steel reinforcement bars are rarely considered during the design stage and they often occur in beam-column joints on site nowadays. Additional time and manpower are often needed to resolve these clashes in an ad-hoc manner. Sometimes, it is impossible to resolve clashes without moving the steel reinforcement bars and redesigning steel reinforcement layout. Therefore, this research aims to develop a framework for automating the steel reinforcement design process for RC frames using the building information modelling (BIM) technology. BIM has been increasingly popular in the architecture, engineering and construction (AEC) industry for some years, but its use in structural design is still limited to extracting construction design and clash detection. However, BIM models provide much geometric and functional information and can be used for steel reinforcement optimization and clash resolution as well.

This research presents an automated steel reinforcement optimization framework with modified version (considering clash resolution) based on the BIM technology. The first framework uses information from a BIM model to intelligently suggest the number, size and arrangement of three types of steel reinforcement (i.e., tensile, compressive, and shear) with minimum steel reinforcement area. The framework uses the developed hybrid Genetic Algorithm-Hooke and Jeeves (GA-HJ) approach to optimize the steel reinforcement according to the loading conditions, end-support conditions and geometry of the RC member (RC beam or RC column). The developed GA-HJ approach increases the efficiency as well as the quality of the optimum solutions. The modified version of the framework is then developed to utilize and integrate the 3D spatial information of RC frame from a BIM model to provide clash-free and optimized steel reinforcement design. The modified framework uses a two-stage GA approach to provide clash-free, optimized, constructable, and design code compliant steel reinforcement design. Overall, the developed frameworks provide fast and error-free steel reinforcement design with the minimum area of steel reinforcement when compared with currently available steel reinforcement design approaches. In addition, the developed GA-HJ approach can be modified and used to support other building design optimization problems in future.
N.A.
HKUST Evaluation of the BIM Adoption for Civil Infrastructure and Development of a 5D BIM Financial Decision Making Framework Thesis 08/2015 Qiqi LU Building Information Modeling (BIM) has been widely adopted in the building industry. However, the application of BIM in civil infrastructure facilities, sometimes referred to Civil Information Modeling (CIM), is relatively lacking and slow. Researchers and practitioners are increasingly putting efforts into CIM study and implementation, but so far there is no comprehensive review of their efforts in this regard. Such study can help the academia and industry find the gaps and identify future research direction. Therefore, this work firstly presents a framework to evaluate the current practices of CIM adoption for various civil infrastructure facilities. In this study, civil infrastructure facilities were divided into nine categories for evaluation and the efforts with regard to CIM adoption for each infrastructure category were evaluated in six aspects. This study summarizes the results of 171 case studies and 62 academic papers on CIM. Based on the evaluation and comparison results, research gaps and future direction are identified. For example, CIM uses for detailed design and documentation phase and O&M phase like 5D cost estimation, are seldom conducted and studied.

5D BIM has been studied in academic research and implemented in industry. However, existing studies on 5D BIM focus on cash outflow estimation rather than cash inflow analysis and project financing. This thesis proposes a 5D BIM-based framework for cash flow analysis and project financing. This framework considers contract types and retainage to estimate cash inflow, and cash outflow patterns for equipment, manpower and materials to accurately estimate cash outflow. Project financing scenarios can also be evaluated using the framework. One building case and one bridge case are demonstrated to validate the proposed framework by considering various what-if scenarios. The framework can help contractors analyze the cash flow and make appropriate decisions for different design and payment scheme alternatives in various types of construction projects.
N.A.
HKUST A BIM-based Framework for Site Layout Optimization and Material Logistics Planning on Congested Construction Sites Thesis 08/2015 Srinath KUMAR Urban construction projects are characterized by the lack of available space on construction sites. Due to the confined nature of such sites, construction materials, equipment and manpower must be managed within the same area, leading to frequent conflicts. As a result, the construction site layout and material logistics plans should be carefully coordinated to ensure a seamless flow of materials, equipment and labor. Existing studies focus on developing systems to address construction site layout planning (CSLP) and material logistics planning (MLP). However, such systems fail to address the mutual impacts and inter-dependencies between the site layout and material logistics plans. Furthermore, existing systems suffer from a lack of automation and inability to address construction delays. Therefore, this research aims to develop a framework for planning the site layout and material logistics on construction sites making use of building information modeling (BIM) technology. BIM has been used in the construction industry for over a decade, but its use in construction planning is still limited to clash detection and 4D simulation. BIM models however, are rich information sources and can be used for construction site layout and material logistics planning as well.

This research presents an automated CSLP framework and a MLP framework that are developed based on BIM technology. The first framework utilizes information stored in BIM models to estimate the size, type and number of temporary facilities required by a construction project during different time intervals. By leveraging the functionality offered by the Autodesk Revit application programming interface (API), several of the computations are automated, significantly reducing manual effort. The second framework is designed to integrate material quantity information from BIM models with construction progress data and material delivery information. This framework coordinates material logistics along with the site layout, giving special emphasis on responding to construction delays. The two frameworks together can be used to facilitate CSLP and MLP on congested construction sites.
N.A.
HKUST A Building Information Modeling Framework for Waste Estimation and Embodied Carbon Calculation of Buildings Thesis 08/2012 Yinghui MA The construction industry is a major consumer of natural resources and energy, and a major contributor of waste and carbon emissions. Many countries have taken initiatives to reduce the negative environmental impacts in terms of waste and carbon emissions caused by construction activities; however, implementations of those strategies are often based on experience and heuristics rather than quantitative data. The value of estimating and evaluating construction and demolition (C&D) waste and carbon emissions in the construction industry has been indicated in literature. Nevertheless, tools that can accurately and conveniently estimate the amount of the waste from construction projects are lacking. On the other hand, current carbon emission analysis tools mostly focus on the estimation of operational carbon. Although embodied carbon (EC) of building materials has shown increasingly important in carbon emission analysis of buildings, the current tools that estimate EC are still primitive and not automated.

Therefore, this study aims to develop a framework for a lifecycle evaluation of waste and carbon emissions of buildings leveraging the building information modeling (BIM) technology. BIM represents the process of development and use of a computer generated model to simulate the planning, design, construction and operation of a building facility. BIM has been increasingly used in the architectural, engineering and construction industry for building performance analysis and construction planning. However, the use of BIM for estimation and planning of C&D waste and EC is still lacking. This thesis presents the automated BIM-based C&D waste estimation system and the automated BIM-based EC estimation system that the author has developed. The first system was designed to extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. The second system was designed to integrate extracted material and element information with external carbon inventory databases for embodied carbon and energy estimation.

With the two systems, decision making could be facilitated among clients, architects, engineers, and other stakeholders. The systems can also be used combined with current tools to perform a lifecycle analysis. As the BIM technology has been increasingly adopted and digital building information models will likely to be available for most buildings and even infrastructures in the future, our systems can be applied in various projects.
N.A.